Newham Council, in partnership with the Royal Docks Team (a joint initiative from the Mayor of London and the Mayor of Newham) is improving the road layout and street environment along the Royal Docks Corridor, which includes Silvertown Way and the section of North Woolwich Road up to Connaught Bridge.

These roads were originally constructed to accommodate commercial and industrial vehicle traffic to serve the historic uses of the Royal Docks. With the Royal Docks Enterprise Zone, a designated area that provides tax breaks and other business incentives to attract foreign investment, 60,000 new jobs and 25,500 new homes are forecast in the wider area. The Royal Docks Corridor, which runs along the south-west boundary of the Enterprise Zone, is integral to the growth of the area. The Royal Docks Corridor project will provide a general uplift by creating new public spaces, wider pavements, separated cycle lanes, better crossings and connections to local destinations, and more greenery and planting. These changes aim to create safe and attractive streets for everyone to enjoy, improving air quality, and encouraging people to be more active and healthy.

Construction Programme 

The indicative construction programme is divided into five phases shown on the map and timeline below.

Timeline june 2024

Rdc map

Scheme objectives

The objectives of the scheme are consistent with the Mayor of London’s Transport Strategy and TfL’s Healthy Streets outcomes.

We want to:

  • Make it easier, safer and more convenient for people to walk, cycle and use public transport
  • Improve air quality and reduce pollution levels
  • Reduce the dominance of traffic
  • Slow down vehicle speeds
  • Provide a much safer environment for pedestrians and cyclists
  • Improve access and connections to the DLR stations along the route
  • Ensure that bus services run smoothly and are on time
  • Include more greenery, trees and planting
  • Make people feel safer and more comfortable in the area
  • Make the street more attractive and create a ‘sense of place’ so that people enjoy spending time here

What the scheme will look like 

The images below are visualisations to show how the scheme is expected to appear. For information about construction start and completion timescales, please go to section 4. Construction programme.

Rdc canning town visual 1 no art
Canning Town Visual 

Roy nwr silvertown way tidal basin road visual 2 no art 1Silvertown Way Tidal Basin Road Visual

Rdc silvertown viaduct visual 3 no artSilvertown Viaduct Visual 

Rdc britannia village visual 4 no artBritannia Village Visual

Rdc pontoon dock visual 5 no artPontoon Dock Visual

Rdc rdc connaught peninsula visual 6 no artConnaught Peninsula Visual